Skip to main content

About

  • Our History
  • Culture & Values
  • Key People

Services

  • Heritage Consultancy
  • Archaeology Contracting
  • Post-Excavation
  • Geophysics and Exploration
  • Community Engagement

Projects

  • All Projects

Careers

  • Why Join
  • Current Vacancies
  • Finding a Job

Connect

  • CIfA Registered Organisation
  • UVDB Verify Empowered by Achilles
  • Constructionline: A UK Government Certification Service
  • Contractors Health and Safety Assessment Scheme
  • SMAS Worksafe logo
  • Builders Profile Logo
  • HESPR Quality Assured
  • Inclusive Employers Bronze Accreditation
  • ISO 9001: British Assessment Bureau Quality Management Accreditation 8289
  • ISO 14001: British Assessment Bureau Environmental Management Accreditation 8289
  • ISO 27001: British Assessment Bureau Information Security Management Accreditation 8289
  • ISO 45001: British Assessment Bureau Health and Safety Management Accreditation 8289
  • Armed Forces Covenant

© 2026 Headland Archaeology (UK) Ltd. All rights reserved.

Privacy PolicyCookie PolicyAnti Slavery and Human TraffickingSitemapTerms and Conditions

Website designed by Studio SC7

Newlands Hill Wind Farm, East Lothian
Home
About Us
Services
Projects
Careers
News
Contact

Project

Newlands Hill Wind Farm, East Lothian

Headland Archaeology’s Consultancy Team supported Belltown Power in delivering a robust cultural heritage assessment for the Newlands Hill Wind Farm EIA.

Project details

Client
Belltown Power UK Ltd
Sector
Renewable Energy - Onshore Wind
Location
Scotland
Areas & regions
Lammermuir Hills · East Lothian

Since 2021, Headland Archaeology’s Consultancy Team had been working on the Environmental Impact Assessment (EIA) for a proposed wind farm in East Lothian, which was submitted to the Energy Consents Unit (ECU) in November 2023. The proposed development site measured approximately 1,000 hectares and comprised 17 wind turbines of up to 8MW each (generating up to 136MW), with a maximum tip height of 200 metres.

The cultural heritage EIA included a baseline desk-based assessment and walkover survey to determine archaeological potential. A total of 29 heritage assets were identified within the site. Working with the project’s design team, an infrastructure layout was developed which avoided all known heritage assets within the site, except for a historic trackway which was crossed by internal access tracks and could not be avoided.

In addition, potential impacts along the 19km route required for delivery of the Abnormal Indivisible Loads (AIL) from the A1 to the site were assessed. Solutions were developed to avoid a Scheduled Monument, and areas of high archaeological potential along the route were assessed and defined. The route would involve direct impacts on four heritage assets, including a bridge over a culverted watercourse. These would be mitigated by appropriate levels of survey, excavation, recording, analysis, and publication of results in accordance with a Written Scheme of Investigation (WSI). This included provisions for accidental damage to historic fingerposts along the AIL route, and the WSI was to be agreed with East Lothian Council in advance of construction.

Impacts on the setting of heritage assets could also arise due to the scale of the proposed turbines, their potential to detract from key views to or from a heritage asset, or changes affecting how a heritage asset was experienced. Screening therefore considered each potentially affected asset to identify those within the zone of theoretical visibility (ZTV) and to assess whether their cultural significance was likely to be harmed by the development.

Field visits were undertaken to the nearby highly designated and sensitive landscape Yester Estate in Gifford, which is protected as an Inventory Garden and Designed Landscape and Conservation Area, and contains Scheduled Monuments and numerous Listed Buildings. Early engagement with Historic Environment Scotland (HES) was undertaken, and photomontage visualisations were provided for key locations within the Estate identified as most relevant for assessing the potential effects of the proposed development.

Significant adverse effects were identified as likely at this stage. In response, the client (Belltown) undertook a redesign, repositioning the turbines further from the Yester Estate. This redesign also reduced the impact of the development on the setting of several Iron Age forts located along the base of the Lothian Edge.

The final design was assessed in the EIA as resulting in no more than a negligible overall effect on cultural heritage. HES agreed that the revised proposal would be unlikely to cause significant adverse effects. However, East Lothian Council disagreed and indicated their intention to object to the development. As a result, the project will proceed to a Public Local Inquiry (PLI), for which Belltown has retained Headland’s Consultancy services.

At a glance

Project highlights

  • Successful Design Mitigation with all known heritage assets within the wind farm area avoided, except one unavoidable crossing over a historic trackway.
  • Proactive heritage protection with solutions developed to avoid impacts on a Scheduled Monument and other sensitive areas along the Abnormal Indivisible Load route.
  • Strong collaboration and client-led redesign to reduce adverse effects on highly designated landscapes and Iron Age forts.
  • Effective visual impact assessment with Photomontage visualisations and field visits informing robust settings assessments for key heritage assets.
Archaeologists at work on site

Planning a project?

Speak to our team about heritage requirements, programmes, and delivery.

  • Heritage advice aligned with your programme and planning route
  • Consultancy and contracting under one roof
  • Clear scopes, programmes, and delivery milestones
  • Experience across sectors from housing to infrastructure
  • National coverage with regional teams
  • Single point of contact from first conversation to sign-off
Get in touchView services